November 16, 2020 | Susan Napier-Sewell

Monitoring a Well Prior to Removing the BOP Stack

Why is it important to understand fundamental well control techniques beyond standard circulation techniques?

Monitoring a well prior to removing the BOP (blowout preventer) stack is a critical operation that requires isolation, certainty prior to barrier removal. In the event that flow is observed before stack removal, kill methods will be limited.

The following incident from IOGP* describes a familiar method of handling an influx behind casing where standard circulation techniques are not available. The Lubricate and Bleed method is one approach to managing an influx while waiting on cement (WOC), swapping out gas at surface for overbalanced fluid while managing pressure on the well. [The lubricate and bleed procedure is the way to remove the gas when the circulation is impossible to conduct. The basic theory is the same as Volumetric Well Control Method but a reverse process.]

The incident description helps highlight the importance of understanding fundamental well control techniques beyond standard circulation techniques and demonstrates the relevance of alternative kill methods.

Lubricate and bleed influx behind cemented casing 

The well section was successfully drilled through drawn-down sand formations, the casing was run to setting depth and the subsequent cement job was pumped without issue.

After WOC to reach 50 psi compressive strength, the well, which was being monitored with the trip tank, showed a quick 6.8 bbl gain. The well was secured by closing the BOP. The well was monitored while cement continued setting to >500 psi compressive strength; initial SICP was 230 psi and increased to a stable value of 310 psi.

The well was killed using the lubricate and bleed method of well control, reducing SICP from 310 psi to 0 psi with 18 L&B cycles using 10.1 ppg NAF mud: 2 bbls/cycle lubricated (45 minutes wait time after each lubrication), 20 psi gas bled/cycle (30 minutes of monitoring after each bleed), total 34.75 bbls lubricated.

What went wrong?

Charged formation and potentially insufficient lead cement slurry quality.

Corrective actions and recommendations

Continued focus on well control during and after cementing operations with special attention to WOC and flow checking prior to the removal of BOP for wellhead installations.

The incident represents an example of why it should always be assumed that a well is capable of flow.

Certain regions have historically seen inconsistency in cement material quality; the incident highlights the importance of the quality of cement materials.

This blog post content is taken from the Safety Zone, IOGP* (International Association of Oil & Gas Producers) Well Control Incident Lesson Sharing report 20-8.

Founded in 1988, the TapRooT® Root Cause Analysis System solves hurdles every investigator faces

TapRooT® Root Cause Analysis Training System takes an investigator beyond his or her knowledge to think outside the box. Backed with extensive research in human performance, incident investigation, and root cause analysis, TapRooT® is a global leader in improved investigation effectiveness and productivity, stopping finger-pointing and blame, improving equipment reliability, and fixing operating problems.

NOTE: The above picture was taken prior to the pandemic and does not reflect COVID-19 practices that are part of current TapRooT® courses. 

TapRooT® Root Cause Analysis Training courses are taught all over the world

System Improvements, the creator of the TapRooT® System, has a team of investigators and instructors with years of extensive training ready to offer assistance worldwide. 

If you are interested in learning how to stop repeat incidents, find a 2-Day or 5-Day course; or view the complete selection of TapRooT® courses.  We are available to train you and your staff on-site at your workplace; Contact us to discuss your needs. You may also call us at 865.539.2139 to discuss any questions you may have.

Keep in touch to improve your problem-solving skills

We’re continually training, helping you improve your professional root cause analysis skills. Stay current with your TapRooT® Root Cause Analysis skills and training through:

Categories
Equipment Reliability / Equifactor®, Root Cause Analysis
-->
Show Comments

Leave a Reply

Your email address will not be published. Required fields are marked *